Scout
Check whether your land could support solar, storage or energy infrastructure — privately, in minutes.
UK solar · BESS · grid-connected land
Land.solar is not a directory of plots. It is the permissioned network where land, grid readiness, project rights, capital and developers meet — starting in the UK.
Exact site data is private by default. This is indicative screening, not a grid offer.
45–47 GW
UK solar ambition by 2030
~21 GW
Installed solar by late 2025
Grid-first
Readiness, not raw acreage, is the scarce asset
Why now
Connection queues are being ordered by readiness — planning consent and land rights included. Verified control of land and evidence is worth more than a scraped lead. Battery storage planning in Great Britain has accelerated; co-located solar-plus-BESS is no longer theoretical.

The funnel we own
01
Raw land
02
Site intelligence
03
Landowner consent
04
Grid / planning readiness
05
Developer match
06
Land control
07
Ready-to-build
08
Asset transaction
Product stack
Check whether your land could support solar, storage or energy infrastructure — privately, in minutes.
A ranked national map of sites most likely to become financeable, buildable, grid-connected projects.
A probabilistic readiness score. Distance is a signal. An offer in the data room is evidence.
NDA, title, tenancy, cable rights, offers and milestones in one auditable file.
B2B introductions and project data rooms. No retail, no fractional ownership, no securities offers.

The killer workflow
Who it is for
Does this land have potential, and who can I trust?
Which holdings are worth a mandate?
Stop wasting origination on non-viable leads.
Prioritise connection work by evidence, not acreage.
Keep low-quality sites out of the process.
Is the pipeline real, controlled and bankable?
Exact coordinates, title and identity never hit a public map. Disclosure is consented and logged.
We will not describe a site as grid-viable unless formal evidence supports it.
Independent professional referrals sit outside the platform. Indicative rents are not a guaranteed outcome.
Guides
Landowners
What actually happens when a developer wants your land, what you should not sign on a first call, and how Land.solar keeps the file private until you choose otherwise.
Landowners
Battery energy storage is a different object to a solar farm. Smaller land, harder grid questions, and a different planning and fire-safety conversation.
Requirements
Usable area, shape, access, agricultural land, landscape and the 100 MW NSIP threshold — the actual screens, not a brochure.
Legal
The option is where most landowners actually live for three to seven years. The lease is the prize if planning and grid land. They are not the same document.
The energy transition will be constrained by the conversion of physical land into grid-connected, consented, financeable infrastructure.